Zefektivnění přísunu surovin aglomeračního provozu

Loading...
Thumbnail Image

Downloads

0

Date issued

Authors

Žihala, Rostislav

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

This master thesis is engaged in more effective material delivery for Sintering plant. The goal is minimalize cost regarding to fees for wagons which are not unloaded in appointed days. This thesis is focused on unloaded action, stocking and handling with raw materials. There was made a causes analyse of fees billing from ČD due to wagons which are not unloaded during 24 hours. Part of that anylyse is proposal for fees elimination nad declining cost that are necessary for production of a final products. The goal of that master thesis is identification of factors, that affect time necessary for wagons staying on siding rail and fees range for wagons which exceeded gratis staying time that is 24 hours. This way is possible for minimalize of fees in reference to operational and capacitive unloading, storage areas and thawing tunnels.

Description

Import 04/07/2011

Subject(s)

material supply, fees for wagons after gratis time 24 hours, unload, storage areas, thawing tunnels

Citation