Technologie sanace suterénu zadaného objektu
Loading...
Downloads
1
Date issued
Authors
Bořuta, Tomáš
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
The purpose of this dissertation is to design basement with appropriate remediation measures. Basement is damaged by both, the static pressure of the surrounding soil, and damp due to damaged waterproofing. Therefore the goal of this work is to propose such measures in order to be able to continue fully utilize the basement with the least possible disruption. The first problem is solved by using the HeliBeam system that statically reinforces the whole structure. The second issue was removed by pressure grouting. Part of the dissertation is a schedule that establishes time table for both parts of the remedy process. Part of this schedule is also the financial cost based on the selected model object.
Description
Import 04/02/2014
Subject(s)
technological proces, basement, time schedule, itemized budget, static reinforcement, pressure grouting, remediation