Technologie provádění železobetonové monolitické konstrukce ve vztahu k možnosti minimalizace doby výstavby

Loading...
Thumbnail Image

Downloads

2

Date issued

Authors

Široký, Michal

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

The sis of this thesis is to design different solutions for construction period reduction of building on monolithic reinforced concrete ceiling slab. The various types of formwork sets by some producers on Czech market have been chosen for comparing. For each set was determined the number of workers according to its complexity, the values of total installation time and works connected with concreting were calculated as well. The most profitable solution was defined in accordance with detailed itemized budget and timetable workflow which was done for each formwork set. To determine faster construction period were assessed other conditions as reinforcement and concrete works. Some other parts of this bachelor thesis are technological prescription of ceiling plate, organization scheme of realization reinforced concrete structure and drawing documentation.

Description

Import 26/06/2013

Subject(s)

monolithic reinforced concrete ceiling slab, construction period reduction, ceiling shutter, timetable of workflow, itemized budget, technological prescription

Citation