Geodetické práce při výstavbě mostu přes údolí potoka Kremlice na silnici I/11

Loading...
Thumbnail Image

Downloads

5

Date issued

Authors

Šmídová, Žaneta

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

This thesis shows meeting the requirements on the accuracy of the construction of the bridge structure through the comparison of the surveying the real construction and the designed one. The first part introduces the chosen location and the bridge structure. The next part describes the technical standards and regulations related to this issue. That is followed by the accuracy analysis prior to the surveying and the used surveying methods and devices are presented. The main part of the thesis deals with the sequence of the practical implementation of the construction with the focus on the geodetic works within the individual stages of the construction. Finally, the thesis evaluates the importance of a surveyor on a building site.

Description

Import 22/07/2015

Subject(s)

geometric parameter, geodetic transferring, check surveying, foundations, substructure, steel frame, bridge structure

Citation