Zaměření skutečného stavu inundačního mostu

Loading...
Thumbnail Image

Downloads

1

Date issued

Authors

Hromádka, Pavel

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

The subjekt of this bachelors work is alignment of real state of bridge. Concretely it concers bridge built west from village Stříbřec in South Bohemia, from year 1925. Bridge ges over river called Nová Řeka. Alignment would be base for recontruction of bridge. Three geodetic methods were used – GNSS, trigonometrical measuring and levelling. Then measuring was processed by calculating and graphical softwares (Kokeš and Microstation). Final documentation consists 3D plan and planimetrical and hypsographical plan.

Description

Import 26/06/2013

Subject(s)

geodetical work, trigonometry, GNSS, levelling, bridge of Stříbřec, Microstation

Citation