Zátěžová zkouška mostu silnice II/247 Litoměřice přivaděče k průmyslové zóně Prosmyky I. část
Loading...
Downloads
7
Date issued
Authors
Lérová, Kristýna
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
Graduation theses solves load test of bridge SO 204 over the river Labe in town Litomerice. Survey content advance working on the bridge and also altimetry of watchpoints. There was used direct precise levelling and tensiometr method to survey vertical shift. Vertical shift of all watchpoints on bridge structure was survey by this method. Vertical shifts of watch points in various load modes are tabulate and display in graphs. The bridge was open on the basis of survey results.
Description
Import 29/09/2010
Subject(s)
surveying, load test of the bridge, altimetry, vertical shifts