Návrh komplexního řešení stavby „Sanace spojovací koleje ČSM sever – ČSM jih“
Loading...
Downloads
2
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
Bc. Ondřej Halfar, diploma thesis, Ing. Leopold Hudeček, Ph.D. Ostrava 2017, Proposal of complete solution construction „Restorations track connecting sidings mines ČSM North and ČSM South“.
This diploma thesis is solved as a variant proposal of solution of the remediation of the negative impact of deep mining on the connecting track of ČSM North - ČSM South siding with the aim of finding optimal solution of the route of the track, taking into account the expected transformation of the area due to the existing and future mining activities so as to allow the seamless operation of both workplaces siding AWT, a.s.
Mining plants OKD ČSM North and ČSM South are interconnected connecting sidings, inserted into the track section Karviná-Doly - Albrechtice near Český Těšín. The connecting rail with the rail bottom constructions overcomes communication II. Class II / 475, crosses the pipeline route of the medium-pressure gas pipeline and the local road crossing equipped with PZZ and is run alongside other line constructions of the degassing gas pipeline, mining water and electrical installations.
Description
Subject(s)
mine, train, AWT, remadiation, connecting track, OKD, ČSM