Návrh přípravy porubního bloku 331 205 Důl ČSM

Loading...
Thumbnail Image

Downloads

3

Date issued

Authors

Fliega, Roman

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

The thesis deals with preparation of the exploitation block 331 205 in the seam No. 33, 2nd block, at CSM Mine – Northern Plant. At the beginning my work is focused on mining – geological and mode of deposition conditions of CSM Mine. Then it solves the proposal of the exploitation block preparation itself, including driving technology, mechanisation and electrification. Safety measures follow in the form of undesirable influence on mining environment. Parameters of driving and exploitation technologies and their using form separate part of this thesis. The conclusion of my work is devoted to the economic evaluation of the proposal. Proposal enables to opening acceleration and effective mining out of longwall face No. 331 205 by means of the up-to-date technology

Description

Import 29/09/2010

Subject(s)

longwall face, face block, face working area, exploitation technology, entry driving, safety precautions, heading machine

Citation