Využití analýzy časových řad pro predikci výroby Válcovny drátů a jemných profilů
Loading...
Downloads
29
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
The aim of this thesis was to create a model of production prediction in TŘINECKÉ ŽELEZÁRNY, a.s. Winters as well as Box – Jenkinson methodology were used. Based on the results of the analyzes, a prediction was created for the Wire and Fine Rolling Mill. This Model is dependent on the development of primary production.
Description
Delayed publication
Available after
Subject(s)
Planing, prediction, Winters metod, Box – Jenkinson methodology