Technologie zajišťování stavební jámy svahováním a záporovým pažením
Loading...
Downloads
0
Date issued
Authors
Soukupová, Radka
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
An integral part of every building are ground work. They can be divided into preparatory earthworks, assessment work, drainage above the site, rough grading, excavation work assessment, major earthworks and finishing earthwork. Bachelor’s thesis content is the assessment of the two technologies to ensure the construction pit in specific geological conditions and the particular object. Comparison criterion is the execution time and financial considerations.
Another aim of this bachelor’s thesis is to describe the technological process rider bracing and securing of pits embankment, designing mechanical assemblies, the definition of mining processes.
Third goal is to describe qualitative and safety requirements.
Description
Import 05/08/2014
Subject(s)
construction pit, rider bracing, drilling rig, anchoring, extraction of material excavated, technological proces, safety, working machines, injection