Vybavování porubu č. 40 907 na Důlním závodě 1, lokalita Darkov
Loading...
Downloads
3
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
In this thesis, I suggest mining equipment with all applicable components, transport and chronological installation of the longwall machine after the recall. I will focus mainly on special transport oversized loads and emphasize safety criteria right at the traffic. Describe the individual machines and widely used extraction equipment designed specifically for the transport of excessive loads, including traffic routes where the focus on the new type of monorail, ZD - 24 D / 130. And taking advantage of a problem with old water already extracted from the excavation, which leaks into question stoping, and action of the excavation drainage system while pumping at the face no. 40 907.
Description
Subject(s)
mechanical supports, suspended railway, safety in transport, excessive burden drainage excavation equipment of the longwall, the traction means, pumping at the face