Absolvování individuální odborné praxe

Loading...
Thumbnail Image

Downloads

11

Date issued

Authors

Vaculík, Roman

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

ÚK/Sklad diplomových prací

Signature

200901069

Abstract

I have worked out my bachelor project on the basis of the individual professional practice gained in the company CTES Service, Ltd. In this project I am describing my practical training experience and dealing with the individual task set by ČEZ Distribution, Inc. It covers the connection of 24 newly-built apartment houses to electricity supply system. Each house consists of 11 housing units, the communal premises and an elevator. To fulfill the task I was supposed to work out the project documentation, including the building plan, design of the underground high voltage line relaying, high voltage service-drop cable, design of a new compact kiosk transformer station and layout of low voltage cabled distribution, which is interrupted in disconnection protection boxes and which loops the main house boxes. By a proper fuse handling in disconnection protection boxes, the power failure can be eliminated.

Description

Subject(s)

underground high voltage and low voltage line, compact transformer station, disconnection protection box, main house boxes, transformer, loop connection, protection, fuses

Citation