dc.contributor.author | Briš, Radim | |
dc.contributor.author | Gala, Jan | |
dc.date.accessioned | 2011-02-07T09:16:26Z | |
dc.date.available | 2011-02-07T09:16:26Z | |
dc.date.issued | 2008 | |
dc.identifier.citation | Advances in electrical and electronic engineering. 2008, vol. 7, no. 1, 2, p. 158-161. | en |
dc.identifier.issn | 1336-1376 | |
dc.identifier.uri | http://hdl.handle.net/10084/84122 | |
dc.description.abstract | The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a
high voltage (HV) substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the
paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters
of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being
optimized), the failure rate and mean time to repair - MTTR. | en |
dc.format.extent | 318669 bytes | cs |
dc.format.mimetype | application/pdf | cs |
dc.language.iso | en | en |
dc.publisher | Žilinská univerzita v Žiline. Elektrotechnická fakulta | en |
dc.relation.ispartofseries | Advances in electrical and electronic engineering | en |
dc.relation.uri | http://advances.utc.sk/index.php/AEEE | en |
dc.rights | Creative Commons Attribution 3.0 Unported (CC BY 3.0) | |
dc.rights | © Žilinská univerzita v Žiline. Elektrotechnická fakulta | |
dc.rights.uri | http://creativecommons.org/licenses/by/3.0/ | |
dc.title | Maintenance optimization of high voltage substation model | en |
dc.type | article | en |
dc.rights.access | openAccess | |
dc.type.version | publishedVersion | cs |
dc.type.status | Peer-reviewed | cs |