Technologický postup pro provádění konstrukce stropu bytového domu ve Frýdlantu nad Ostravicí
Loading...
Downloads
10
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
My bachelor thesis deals with elaboration of project documentation for building permit of apartment house. The bachelor thesis contains the technological procedure of the ceiling construction of the POROTHERM MIAKO system, the schedule of work progress and the budget for the stage of the ceiling construction.
The apartment building is without basement with three above-ground floors and is covered with a flat roof. The building is lined with ceramic blocks POROTHERM. The result of my bachelor thesis is the processed technological procedure according to the manufacturer's technological regulations. The construction of the ceiling construction will take 48 days and the cost of construction of the ceiling is CZK 721,978.87 without VAT.
Description
Subject(s)
ceiling, ceiling beam, ceiling inserts, concreting, POROTHERM, MIAKO, POT, stiffening rib, timetable