Racionalizace výroby speciální součásti

Loading...
Thumbnail Image

Downloads

2

Date issued

Authors

Štencl, David

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

This bachelor thesis deals with the production process of a spraying pipe. The first part is focused on description of existing production technology showed by high difficulty and low level of work mechanization. The second part is focused on the project of new complex production technology which assumes small construction change, utilization of self-assembly and clamping preparations. The lower production costs by preserving prescribed production quality is achieved by use of required machine tool with lower hourly rate (exchange originally used up of a horizontal boring machine AFD 100 beyond a jig borer VR 5 NC) and using the service with lower required qualification. At the conclusion is carried out an evaluation bearing out accuracy of an executed change of production process of given machine component.

Description

Import 31/08/2009

Subject(s)

Paper industry, spraying pipe, construction change, utilization of preparations, lower production costs

Citation