Optimalizace výrobního procesu montáže CSH čerpacích stanic a hydraulik

Loading...
Thumbnail Image

Downloads

0

Date issued

Authors

Kudělka, Jiří

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

KUDĚLKA, J. The Optimalization of the Assembly Process Plan for the CSH Hydraulic Power Pack and Hydraulics. Ostrava: Department of Mechanical Technology, Faculty of Mechanical Engineering, VŠB – Technical University of Ostrava, 2009, p. 44. Thesis, head Kočiščáková, P. The thesis deals with the manufacturing process optimisation in the company TTS Kocks Ostrava Ltd. The aim of the thesis is the manufacturing process optimisation, work procedures assembly, operating time monitoring, or eventually working area layout and reduction of production expenses. The first part of the thesis deals with the general characteristics of problem solving and current situation description in the terms of range of products, work organisation and additional entry information. The following part of the thesis deals with the requirement specification and problem determination. In the end the solutions for the manufacturing process optimisation are introduced.

Description

Import 31/08/2009

Subject(s)

Work organization, assembly, time studies.

Citation