Optimalizace výrobního procesu montáže CSH čerpacích stanic a hydraulik
Loading...
Downloads
0
Date issued
Authors
Kudělka, Jiří
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
KUDĚLKA, J. The Optimalization of the Assembly Process Plan for the CSH Hydraulic Power Pack and Hydraulics. Ostrava: Department of Mechanical Technology, Faculty of Mechanical Engineering, VŠB – Technical University of Ostrava, 2009, p. 44. Thesis, head Kočiščáková, P.
The thesis deals with the manufacturing process optimisation in the company TTS Kocks Ostrava Ltd. The aim of the thesis is the manufacturing process optimisation, work procedures assembly, operating time monitoring, or eventually working area layout and reduction of production expenses. The first part of the thesis deals with the general characteristics of problem solving and current situation description in the terms of range of products, work organisation and additional entry information.
The following part of the thesis deals with the requirement specification and problem determination. In the end the solutions for the manufacturing process optimisation are introduced.
Description
Import 31/08/2009
Subject(s)
Work organization, assembly, time studies.