Proces vývoje světlometu
Loading...
Downloads
1
Date issued
Authors
Merta, František
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
This thesis deals with the process of the headlamp development. Deals describe the process of the headlamp development from the quotation phase to rump up phase (start of serial production). The aim is to describe the process of the assembly line development., with focus on the workplace nr. 150 (assembly of the hollow screws).
The great emphasis is on the procedure of qualification the select workplace. Evaluative criteria of the selected workplace is machine capability of the screwing. Measured value is deep of screw.
Description
Import 04/07/2011
Subject(s)
headlamp development, workplace nr. 150 (assembly of the hollow screws)