Plán otvírky, přípravy a dobývání 10. kry 16. a 17. sloje Závodu Důl Karviná

Loading...
Thumbnail Image

Downloads

0

Date issued

Authors

Kaczur, David

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

The thesis deals with the extraction of reserves from the 16th and 17th seam around the 10th block in the extraction area of the CSA site. It proposes methods of deposit opening, which specifies ways of the disintegration, loading and excavation of the rock, as well as the specialised equipment used. During the opening and preparation, it determines the size of the dug shaft profiles, including the placement of technical and security equipment and states the ways of material transportation. It also recommends an extraction method to exploit the deposit together with the extraction complex used for this exploitation. Ways of airing during the opening, preparation and extraction stage are mentioned in the thesis, as well as the analysis of risks arising in connection with mining and possible measures for their elimination. With regards to the economics field, the thesis determines the volume of reserves appointed for extraction and the volume of waste incurred during the extraction from the part of an exclusive deposit. It determines the costs involved at individual stages of work and the total relative profit.

Description

Import 22/07/2015

Subject(s)

deposit opening, deposit preparation, extraction, extraction method, reinforcement, extraction complex, exploitation

Citation