Snímkování pracovního dne montážních skupin ve firmě VaKo montáže s.r.o.
Loading...
Downloads
1
Date issued
Authors
Krzyžanek, Karel
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
This thesis deals with the imagery work on assemblies in the company. The practical section discusses the issue of rationalization of work focused on determining the time consumption work. This section is examined in detail the question of practical measurement and recording of work each sensing methods. The practical part in the introduction briefly describes the company VaKo assembly Ltd. its goal, brief history and focus of the company. The film was made on a contract made by TIVA Property Ltd. where he performed installation of railings for residential homes. Done frame work of the group values processed and subsequently analyzed. Based on the information obtained is designed technological-organizational hierarchical scheme that eliminates idle times.
Description
Import 26/06/2013
Subject(s)
frame work day, work rationalization, technological and organizational measures