Návrh překlizu komplexu DBT 2,6 - 5,6 m z porubu 340 800 do porubu 40 205 - Důl Darkov
Loading...
Downloads
6
Date issued
Authors
Zaduban, Ivan
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
In my bachelor thesis I am trying show the uniqueness of the relocation, which began a new
stage in the transportation of excessive loads across the OKD. I describe how to move the
entire mining complex without dismantling, using a method called direct relocation and how
you can move nearly a ton of Eickhoff SL 500 cutter loader body and 61 complete sections of
mechanized support Bucyrus 26/55 weighing 38 tons from the coal face 340 800 to the coal
face 40 205. I am also trying to describe the successful relocation of four PF 6/1042 conveyor
troughs including cable swapper. All these devices are transported in suspension groove ZD
24 - TDS HMZ at the height of 4,5 m above a thill. I show the commitment of all staff at this
breakthrough method of transport, which provides significant financial and material savings
for the entire OKD and shortening the time of relocation as well.
Description
Import 04/07/2011
Subject(s)
POP 2010