Výstavba a provoz dálničního celku D8 – stavba 807 z pohledu státní správy

Loading...
Thumbnail Image

Downloads

1

Date issued

Authors

Volek, Petr

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

Nowadays international and economics situation require that transport branch aspired for the best and the most effective working for its relationship of surrounding but also for its relationship of other states (countrys). Substantial importace is put speciály on the level of road construction, tunnel construction, telematics and information systems. Presumption of success is strict rules, central data processing. It easy controls the results of single processes (actions) which are connected with construction and operation of transport. No organization (no matter what it does) can´t be isolated from changes which are connected with entrance to European Union and which are happen because of European Union and it depends on people if they reach these results (aims). Nowadays international and economics situation require that transport branch aspired for the best and the most effective working for its relationship of surrounding but also for its relationship of other states (countrys). Substantial importace is put speciály on the level of road construction, tunnel construction, telematics and information systems. Presumption of success is strict rules, central data processing. It easy controls the results of single processes (actions) which are connected with construction and operation of transport. No organization (no matter what it does) can´t be isolated from changes which are connected with entrance to European Union and which are happen because of European Union and it depends on people if they reach these results (aims).

Description

Import 29/09/2010

Subject(s)

highway, tunel unit, infosystems, transport signs, kontrol system

Citation