Heuristic algorithm for planning and scheduling of forged pieces heat treatment

Loading...
Thumbnail Image

Downloads

6

Date issued

Journal Title

Journal ISSN

Volume Title

Publisher

Hrvatsko Metalurško Društvo

Location

Není ve fondu ÚK

Signature

Abstract

The paper presents a heuristic algorithm for planning and scheduling of forged pieces heat treatment which allows maximizing the capacity exploitation of the heat treatment process and the entire forging process. Five Focusing Steps continuous improvement process was selected as a methodological basis for the algorithm design. Its application was supported by simulation experiments performed on a dynamic computer model of the researched process. The experimental work has made it possible to elicit the general rules for planning and scheduling of the heat treatment process of forged pieces which reduce losses caused by equipment conversion and setup times, and which increase the throughput of this process. The HIPO diagram was used to design the algorithm.

Description

Subject(s)

forged pieces, heat treatment, planning and scheduling, 5FS continuous improvement process, dynamic simulation, otkivci, toplinska obrada, planiranje i terminiranje, 5FS kontinuirano poboljšanje procesa, dinamička

Citation

Metalurgija. 2012, g. 51, br. 2, s. 225-228.