Method of drilling of coal pillar
Loading...
Downloads
2
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Springer
Location
Není ve fondu ÚK
Signature
Abstract
One of outputs of the research project of the Czech Mining Office “Protection of Employees against Consequences of Rock and Gas Outbursts” was the application of yet not used methods of coal mining in the conditions of the Czech Republic. The aim of these methods is an increase in the recovery of coal reserves blocked in residual pillars left. For the conditions of Paskov Mine (Ostrava-Karviná Mines company) [1], the method of mining by means of long large diameter boreholes was chosen. The contribution provides information on the application of this mining method abroad and in the Czech Republic in the Paskov Mine.
Description
Subject(s)
mining method, large diameter boreholes, mining system, drilling of coal
Citation
Journal of Mining Science. 2011, vol. 47, no. 3, p. 367-375.
Item identifier
Collections
Publikační činnost VŠB-TUO ve Web of Science / Publications of VŠB-TUO in Web of Science
OpenAIRE
Publikační činnost Katedry hornického inženýrství a bezpečnosti / Publications of Department of Mining Engineering and Safety (542)
Články z časopisů s impakt faktorem / Articles from Impact Factor Journals
OpenAIRE
Publikační činnost Katedry hornického inženýrství a bezpečnosti / Publications of Department of Mining Engineering and Safety (542)
Články z časopisů s impakt faktorem / Articles from Impact Factor Journals